The Florida contractor license application for a certified general contractor is form DBPR CILB 5-A, July 2024 edition, adopted by rule 61-35.010. It runs nine sections: application type, personal details, four background questions, two explanation pages, experience, insurance, financial responsibility and a signed declaration, plus fingerprints, a credit report and a fee of $245 or $145.

Listen to this article, about 25 minutes. A synthetic voice reads the article and announces each section title as it begins; tables are read row by row and the questions at the end are left out.

Recorded 18 November 2026 from the article as published that day. Press a chapter to jump there; the highlighted line is what is playing. A play button sits beside every section heading, and once you scroll past this player a bar at the bottom of the screen keeps the controls in reach. Tap or click any sentence to hear the reading start from there.

On this page: form DBPR CILB 5-A read section by section from the adopted July 2024 copy, the attachment checklist, the arithmetic behind the $245 and $145 fees, the 30 and 90 day limits in section 120.60, and what three applicants reported in 2026.

Think you already know this? Five questions, one minute.

Every answer is on this page. Answer from what you know now; the page fills in the rest.

  1. 1. Which edition of form DBPR CILB 5-A does rule 61-35.010 adopt?

  2. 2. Which attachment is required only of applicants for an active license?

  3. 3. Which of these does question one in Section III tell you NOT to declare?

  4. 4. What is the unlicensed activity fee added to every initial license under section 455.2281?

  5. 5. Under section 120.60(1), how long does an agency have to approve or deny a completed application?

Most pages about this form describe it from memory. This one was written with the adopted copy open: every section below is quoted from the form or the rule it points to, with a link, and all of it was read on 21 October 2026 unless a different date is given. The statutes behind the background questions were reread in their 2026 edition on 18 November 2026.

Which form is the Florida contractor license application, and is your copy current?

There is no single Florida contractor license application. Rule 61-35.010 adopts one form per license category: DBPR CILB 5-A for a certified general contractor as an individual, 5-B for building, 5-C for residential, and on through 5-AS for structural carpentry, with a parallel 6 series for a contractor who is qualifying a business. The rule was amended effective 19 March 2025 and again 28 June 2026, and the adopted copy of form 5-A on the Florida rules site carries the footer “Eff. Date: July 2024”. The page on which license covers which work helps when the category itself is the open question.

FormWho it is forEdition the rule adopts
DBPR CILB 5-ACertified general contractor, individualJuly 2024
DBPR CILB 5-BCertified building contractor, individualJuly 2024
DBPR CILB 5-CCertified residential contractor, individualJuly 2024
DBPR CILB 5-ICertified roofing contractor, individualJuly 2024
DBPR CILB 5-MCertified plumbing contractor, individualJuly 2024
DBPR CILB 5-ACCertified irrigation specialty contractor, individualJune 2024
DBPR CILB 6-ACertified general contractor qualifying a businessJuly 2024

Now the catch. The copy of form 5-C on the DBPR site, read through an Internet Archive capture dated 27 March 2025, is still the April 2022 edition. Its cover page announces that initial fees were “reduced by 50% for Fiscal Years 2023/2024 and 2024/2025” and tells the applicant to send $145 or $95. Both fiscal years ended on 30 June 2025. So the form the rule adopted and the form the website served were, on that date, two different documents. Check the footer of your copy for the edition date; if it says April 2022, download it again from the DBPR licensing portal rather than a bookmark.

What does the application checklist ask you to attach?

Page one of form 5-A is a checklist headed “Submit all items on the checklist below with your application to ensure faster processing.” Every applicant sends four things: the fee, which is “$245” for a filing between 1 May of an even year and 31 August of an odd year or “$145” between 1 September of an odd year and 30 April of an even year; “Electronic fingerprints”; “Proof of satisfaction of liens, judgments, and discharge of bankruptcy, if applicable”; and “Supporting legal documentation, if necessary”. Applicants for an active license add a credit report “containing a credit score (FICO derived)” with “a public records statement that records have been checked at local, state, and federal levels”, and, if the score is below 660, proof of a board approved 14 hour financial responsibility course.

The form itself says to mail everything to the department at 2601 Blair Stone Road in Tallahassee, but the portal’s checklist page for the same application offers two buttons, “Apply Using Online Services” and “Apply Using a Printable Application”, takes a card or an electronic check online, and adds the detail the paper form leaves out: fingerprints go through a Livescan provider registered with FDLE straight after you apply, and “It may take up to five days for your fingerprint results to be received by the Department”.

A neat stack of documents prepared for a florida contractor license application on a wooden table.
Every applicant sends the fee, fingerprints and any lien or judgment paperwork; active applicants add the credit report.

Form 5-A attachments, from the form’s own checklist

The items on page one of form DBPR CILB 5-A, July 2024 edition. Tick what is in the envelope or the upload. This checks completeness against the form, not eligibility.

Built from the adopted copy of form 5-A read on 21 October 2026. It does not judge whether your experience or credit qualifies; the form and rule 61G4-15 do that.

What do Sections I to V ask, and what gets a file marked deficient?

Section I is one tick box: active or inactive. The bracketed codes beside them, [0605/1042] and [0605/1034], are the portal’s profession and transaction codes, the same ones in the online checklist’s address, so the paper form and the online form are one application. An inactive applicant completes “sections I-VI and IX only” and skips insurance and the credit report. Inactive also pauses the renewal hours, though going active later brings up to one cycle of them due, as the page on the continuing education exemptions and their conditions explains.

Section II wants a Social Security number, which section 455.213(1) makes mandatory for every DBPR application, the full legal name “as it appears on your Social Security card” with no nicknames or initials, a mailing address, at least one physical address that is “not a P.O. Box”, the business location for active applicants, every license held anywhere, and every prior name. That last box carries the only sentence on the form that uses the word deficient: if the name on a supporting document does not match the legal name and the alias is not listed, “Failure to do so will result in a deficient application.” A maiden name on a transcript is enough to trip it.

Section III is four yes or no questions: any conviction or plea, “regardless of adjudication”, including traffic offenses “but not parking, speeding, inspection, or traffic signal violations”; any pending bankruptcy, unsatisfied judgment or lien, “including those for unpaid past-due bills by creditors” and tax liens; any license application ever denied anywhere; and any license ever disciplined anywhere. A yes to the first two sends you to Section IV, with the offense, county, disposition, date and whether sanctions are satisfied; a yes to the last two sends you to Section V with the jurisdiction and the paperwork. The form adds, in capitals, that the answer to question one “WILL BE CHECKED AGAINST LOCAL, STATE AND FEDERAL RECORDS”, which is what the fingerprints are for.

Does a conviction or an unpaid lien stop the application?

A yes in Section III is a question for the board, not an automatic no. What the board may do with it depends on two things the form never spells out: which license you are applying for, and whether the yes is a crime or a debt. The forum answer, that a record ends the matter, is wrong in one direction, and the course advert answer, that anything older than five years vanishes, is wrong in the other.

Start with the five year rule, because it is narrower than it sounds. Section 455.213(3)(b)1 says “A conviction, or any other adjudication, for a crime more than 5 years before the date the application is received by the applicable board may not be grounds for denial”. But paragraph (a) limits that to a list: air conditioning, electrical, mechanical, plumbing, pollutant storage, roofing, sheet metal, solar, pool and spa, underground utility and “Other specialty contractors”. General, building and residential contractors are not on it. Even for the listed trades, subparagraph (b)2 lets the board consider criminal history “if such criminal history has been found to relate to good moral character”.

For form 5-A the test is in section 489.111(3)(a). The board “may refuse to certify an applicant for failure to satisfy the requirement of good moral character only if” there is “a substantial connection” to the duties of a certified contractor and the finding “is supported by clear and convincing evidence”. Subsection (3)(b) then makes the board hand over its findings, the record of evidence and a notice of appeal rights. The courts have held the board to that. In case 5D05-1078, decided by the Fifth District Court of Appeal on 27 January 2006, the board had refused a general contractor applicant with a drug conviction until their civil rights were restored. The court reversed, noting that “The construction industry licensing statutes do not disqualify those convicted of a felony”.

What Section III turns upWhat the text lets the board doSource
A conviction more than 5 years old, specialty trade such as plumbing, roofing, pool or electricalNot grounds for denial, with two carve outs: certain listed crimes related to the trade, and history the board finds relates to good moral characters. 455.213(3)(b)
A conviction of any age, general, building or residential contractorRefusal only with a substantial connection to a contractor’s duties, proved by clear and convincing evidences. 489.111(3)(a)
Still confined or on supervision, specialty tradeMay apply; not denied for that alone; the license can be held until releases. 455.213(3)(c)
An open investigation or prosecution anywhereThe license may be held back until it is completes. 455.213(4)
An unsatisfied judgment or lien, yours or a business you qualifiedThe board shall refuse to qualify youRule 61G4-15.006(1)
A credit score below 660Met by the board approved 14 hour courseRule 61G4-15.006(2)(b)
Any denialWritten grounds, then 21 days to petition for a hearingRule 28-106.111(2)
How the statutes and rules treat each kind of yes in Section III, from sections 455.213, 489.111 and 120.60 of the 2026 Florida Statutes and rules 61G4-15.006 and 28-106.111, read 18 November 2026.

Debts are treated more strictly than convictions. Rule 61G4-15.006(1) says the board “shall refuse to qualify” an applicant whose credit report shows “any unsatisfied judgments or liens”, and the same goes for a business the applicant “previously qualified as a primary qualifier”. The 14 hour course in paragraph (2)(b) cures a score below 660; it does not cure a lien. That is why the checklist asks for proof of satisfaction rather than an explanation. An open matter is different again: section 455.213(4) lets the board hold back a license while the applicant is “under investigation or prosecution in any jurisdiction” until it is complete.

If the answer is no, section 120.60(3) requires a written notice that states “with particularity the grounds” and says what hearing is available. Under rule 28-106.111, the petition for a hearing is due “within 21 days of receipt” of that notice, and a person who misses it “waives the right to request a hearing”. Section 455.213(3)(d) and (e) also require the board to post lists of crimes it has and has not used to deny a license. Two searches on 18 November 2026 did not turn up the construction board’s lists, so whether they are posted could not be confirmed. Whether a particular record matters for a particular license is the board’s call, made on the file, not this page’s.

How does Section VI want your experience written up?

Section VI is the part that decides most files, and it is two parts. Part A is a single tick for the method of qualification, and the methods track section 489.111(2)(c): a four year construction related degree plus one year of experience; one year as a foreman plus three years of college credits; one year as a worker, one as a foreman and two years of credits; two as a worker, one as a foreman and one year of credits; or “Four years experience as a worker or foreman of which at least one year must have been as a foreman.” The July 2024 edition adds a sixth box, the upgrade method, for a certified residential or building contractor active for four years, who is “exempted from the Employment History section” and gives a license number instead. Veterans have three further boxes trading military years for worker years, always with the foreman year kept. The instructions fix the exchange rate: “One year of experience is equal to 2000 hours.”

Method on the formWorker yearsForeman yearsCollege or degree
101Four year construction related degree
201Three years of credits
311Two years of credits
421One year of credits
53 (any mix)1None
6, upgradeActive certified residential or building license for 4 yearsNone
An applicant carefully details her work history for the florida contractor license application at her desk.
Part B takes one sheet per project, and DBPR may call the supervisor named on it.

Part B is one sheet per project: employer name, address and phone, the “Name of qualifying contractor for employer” and that contractor’s license number, a contact name and email, your role as worker or foreman, the project’s dates, name, address and type, your title and duties, and the specifics, “the number of stories, square feet, materials, etc.” Each sheet has tick boxes for the six experience areas in rule 61G4-15.001(2), and the general contractor note requires “four or more” of them plus “at least one year of experience in the construction of structures at least four stories in height”. Nobody signs an affidavit for you. You attest, and the instructions warn that “DBPR may contact the supervisor to verify experience.” The general contractor page and the building contractor page cover what each category’s experience must contain.

What do the insurance and financial responsibility sections require?

Section VII, for active applicants, prints the board’s minimums on the form: for general and building contractors “$300,000 public liability; $50,000 property damage”, for all other categories “$100,000 public liability; $25,000 property damage”, citing section 489.115(5)(a) and rule 61G4-15.003. You tick that you have the cover, and that you have workers’ compensation or an exemption, or “will obtain an exemption within 30 days after your license is issued”. The instructions add that the board runs “random sample audits of licensees by zip code area” to check the tick was true.

Section VIII is the credit report: “a FICO derived credit score of 660 or higher” meets financial stability, and no unsatisfied judgments or liens meets financial responsibility, both under rule 61G4-15.006. Below 660 you attach the 14 hour course certificate and name the school, its provider number, the course and the dates. Section IX is the signature under section 559.79: “Under penalties of perjury, I declare that I have read the foregoing application and the facts stated in it are true.” The requirements page goes further into the insurance table and the credit rule.

What does the application cost, and where do the dollars come from?

The form gives two totals and no arithmetic: $245 in the first year of a licensing biennium, $145 in the second. The pieces are elsewhere. Rule 61G4-12.009(4)(a) sets the initial certification fee at “two hundred dollars ($200.00)”, falling to “one hundred dollars ($100.00)” when paid “within the second year of a biennium”. Paragraph (1)(a) of the same rule holds back “forty dollars ($40.00) for processing of the application” out of the $335 examination fee, paid after a pass. And section 455.2281 adds “a special fee of $5 per licensee” at initial licensure and every renewal to fund unlicensed activity enforcement.

  • First year of a biennium: $200 certification + $40 processing + $5 unlicensed activity fee = $245
  • Second year of a biennium: $100 + $40 + $5 = $145

Those sums match the form to the dollar, which is the best available explanation of its two numbers; the department was not asked and the form does not itemize. The exam fees, $135 at scheduling and $80 per test, are already paid by this point and sit on the business and finance exam page. For a general contractor, how the $295 in exam charges and this $245 add up to $540, and what the form checks once all three papers are passed, is set out on the page about what comes after the general contractor exam. The same sum on the building form, and the fact that its only signature line is the applicant’s own, is worked through in the CBC license fees and money tests. Fingerprinting is priced by the Livescan vendor. Veterans and their spouses can have the initial fees waived under section 455.213(13) within 60 months of discharge, using the MVL 003 form the portal lists beside the 5-A.

How long does DBPR say the application takes?

DBPR does not publish an average. What it is bound by is section 120.60(1), which applies to every Florida agency: “within 30 days after such receipt, notify the applicant of any apparent errors or omissions and request any additional information”, and “An application for a license must be approved or denied within 90 days after receipt of a completed application.” An agency that misses the 90 days has deemed the application approved, though the applicant must give written notice to the agency clerk before relying on that, and the clock stops while a hearing is pending.

The department’s own construction industry FAQ, read through an archive capture of 4 October 2026, fills in the board end: “many initial licensure and change of status applications will require review by the board”, notice of which “is mailed approximately 14 days prior to the meeting”; a license is “typically issued within two weeks after the conclusion of the board meeting in which the application was approved”; and after a denial the notice of intent to deny goes out “Within 60 days after the conclusion of the board meeting”. The same page sets the outer limit: you must apply within four years of passing the exam. What the board does with a referred file is its own page.

Timeline of the florida contractor license application from filing to license issue
The 30 and 90 day limits come from section 120.60(1), Florida Statutes; the five day fingerprint note from the DBPR portal checklist; the board notice, two week issue and 60 day denial notice from the DBPR construction industry FAQ.

What do applicants who filed recently report?

We looked for recent accounts of filing this form, not of sitting the exam, and found few: two Reddit threads from 2026 with three usable comments, after dropping a 2009 contractortalk post written by an expediting service. That is thin, and it is reported here as thin.

  • A commenter in r/Contractor in July 2026 laid out a timeline: business and finance booked in April and sat in May, contract administration in mid June, project management five days later, the application filed “a few days later”, and the license in hand by mid July. Roughly four weeks from filing to license, with no board referral mentioned.
  • In the same thread in April 2026 the original poster, still on the exam, said the paperwork side was what they were dreading; one reply said they had paid a filing service to deal with the state and found it “Easy to work with”.
  • A reply in r/Construction in April 2026, to someone asking how to find a licensed contractor to sign a reference, said Florida no longer requires an affidavit from a licensed general contractor. The form bears that out: there is no affidavit, but each project sheet asks for the qualifying contractor’s name and license number and a contact DBPR may call.

The range is one fast approval, one outsourced filing and one half remembered rule. None of it contradicts the form or the statute, and the one timing account sits well inside the 90 days of section 120.60. It is not a sample; it is what three people reported.

Where do the guides and the rule text disagree?

Four claims met on the way to the form, each set against the text as read on 21 October 2026.

What a page saysWhat the form, the rule or the statute says
A compliance directory’s listing for the board, read from the search index, gives the certified contractor fee as $145 or $95Form 5-A, July 2024 edition: $245 or $145. The $95 figure was the HB 1091 half fee for fiscal years 2023/2024 and 2024/2025, both ended
The DBPR site’s copy of form 5-C, captured 27 March 2025, is the April 2022 edition with the half fee notice on its coverRule 61-35.010 adopts a July 2024 edition of 5-C, reference Ref-17544; check the footer of any copy before filing
A contractortalk post from January 2009, still the top forum result, says DBPR “technically has 45 days” to act on a corrected deficiencySection 120.60(1) gives an agency 30 days to notify errors or omissions and 90 days from a complete application to decide; no 45 day figure appears in the statute or the rule
A forum reply in April 2026 says a licensed contractor’s affidavit is no longer requiredCorrect as far as it goes: the form has no affidavit, but Part B names the qualifying contractor and a contact for every employer, and the applicant signs under penalty of perjury

The pattern is age, not malice. A fee notice outlives the fiscal year it was written for, a 2009 forum post outlives the computer system it complained about, and a directory copies a form it did not reread. The adopted copy on the rules site is dated on every page. Fill in that one.

Frequently asked questions

Can the Florida contractor license application be filed online?

Yes. The DBPR licensing portal’s checklist for the CILB 5-A active application offers “Apply Using Online Services” and “Apply Using a Printable Application”, with card or electronic check payment online. The paper form itself only gives the Tallahassee mailing address.

Do I apply before or after passing the exam?

After. The DBPR FAQ says you must apply for initial licensure within four years of passing the examination, and the $40 processing part of the exam fee is collected after a pass under rule 61G4-12.009(1)(a).

Does an inactive applicant need the credit report and insurance?

No. The instructions say an inactive applicant completes “sections I-VI and IX only”, which leaves out Section VII insurance and Section VIII financial responsibility. Fingerprints are still required.

What counts as a foreman on form 5-A?

The instructions define a foreman as a “Person who is in charge of a group of workers and usually is responsible to a superintendent or a contractor”, and a worker as a skilled tradesperson “able to command the rate of a mechanic in the particular trade”. One year is 2000 hours.

Does a speeding ticket have to be declared in Section III?

No. Question one covers crimes including traffic offenses “but not parking, speeding, inspection, or traffic signal violations”. Anything else, including offenses with adjudication withheld, must be listed and explained in Section IV.

What happens if DBPR finds something missing?

Section 120.60(1) requires the agency to notify you of errors or omissions within 30 days of receipt, and it cannot deny the application for an omission it did not flag in that window. The form names one trap outright: an unlisted alias on a supporting document makes the application deficient.

Finished the page? The same five questions from the top, to see what stuck.


Rules and fees change without notice. This page was checked against the sources linked above on the date shown. If you find something different, tell us in the comments.

Questions and corrections

Platform rules change without notice. If you hit something different when you applied, say so here and we will verify it and update the page.

Leave a Reply

Your email address will not be published. Required fields are marked *