The underground utility license Florida issues is the underground utility and excavation contractor license in section 489.105(3)(n): main sewer, water and storm systems, plus the lines from the main up to the meter. It stops at fire protection piping and at any conductor wiring. Certification takes four years of experience, one as a foreman, and two open book exams.
Listen to this article, about 17 minutes. A synthetic voice reads the article and announces each section title as it begins; tables are read row by row and the questions at the end are left out.
Recorded 25 October 2026 from the article as published that day. Press a chapter to jump there; the highlighted line is what is playing. A play button sits beside every section heading, and once you scroll past this player a bar at the bottom of the screen keeps the controls in reach. Tap or click any sentence to hear the reading start from there.
On this page: the underground utility definition and its three hard stops quoted from section 489.105(3)(n), a rule cited table of where the license ends, the general contractor clause in 489.113(3)(d) read half by half, the trade exam’s eight content weights, the $335 fee arithmetic, and three accounts from people who met the boundary on a job.
Think you already know this? Five questions, one minute.
Every answer is on this page. Answer from what you know now; the page fills in the rest.
-
1. Which division of Florida contractors does the underground utility and excavation contractor belong to?
Section 489.105(3) puts paragraphs (a) to (c) in Division I and (d) to (q) in Division II, and the underground utility contractor is paragraph (n). Florida Statutes 489.105 Read the section
-
2. For a single family house, where does the main water distribution system end under rule 61G4-12.011(7)?
The rule says one, two, three and four family structures have their main water distribution system terminate at the meter. Rule 61G4-12.011 Read the section
-
3. What does section 489.113(3)(a) let a certified building or residential contractor do in site work?
Certified general and underground utility contractors may do site work on any project; building and residential contractors are limited to the lot on which the specific building is located. Florida Statutes 489.113 Read the section
-
4. Which degree fields does rule 61G4-15.001(4)(e) name for the underground utility classification?
The rule lists Building Construction and Civil or Mechanical Engineering for the underground utility classification. Rule 61G4-15.001 Read the section
-
5. Under rule 61G4-12.009, what is the total application and examination fee for certification?
The rule sets $335: $135 at scheduling, $80 for each test and $40 after passing, so two tests come to $335. Rule 61G4-12.009 Read the section
Most pages on this license are adverts for a course, and the course is usually sold as the hard part. The hard part is actually the boundary: which pipe is yours, which belongs to the plumber, and which one the fire sprinkler contractor will want back. This page quotes the boundary instead of describing it. Every rule below was read on 25 October 2026 and is linked to its section.
What does Florida law say an underground utility contractor does?
Section 489.105(3)(n) defines the trade as “a contractor whose services are limited to the construction, installation, and repair, on public or private property” of “main sanitary sewer collection systems, main water distribution systems, storm sewer collection systems, and the continuation of utility lines from the main systems to a point of termination up to and including the meter location for the individual occupancy”. The method does not matter. The statute names open excavation, “directional drilling, auger boring, jacking and boring, trenchless technologies, wet and dry taps, grouting, and slip lining”.
It is a Division II trade. Subsection (3) puts paragraphs (a) to (c) in Division I and paragraphs (d) to (q) in Division II, so underground utility sits beside plumbing and roofing, not beside the general contractor. Like every trade in the chapter it comes in two forms. A certified contractor “shall be allowed to contract in any jurisdiction in the state”, under subsection (8). A registered contractor has met a local competency rule and “may contract only in such jurisdictions”, under subsection (10). The map of which Florida contractor license covers which work places this one among the rest.
Rule 61G4-12.011(14) adds headwalls, end walls and retaining walls up to “twenty feet in elevation above grade”, and pump or lift station housings up to 500 square feet. A lift station building is in scope. A warehouse is not, however small you describe it to the inspector.
Senate Bill 710 of 2026 would have rewritten the definition and the fire piping rule; it was “Withdrawn prior to introduction” on 9 January 2026, so the text quoted here stands.
Where does the underground utility license stop?
The definition carries three hard stops, and the board’s rules add the exact termination points. Each row below is quoted from its source.
| Work | Underground utility contractor? | Source |
|---|---|---|
| Main sewer, water and storm systems, by trench or trenchless method | Yes | 489.105(3)(n) |
| Water line to a house or duplex | Yes, to the meter; one to four family structures “shall have their Main Water Distribution System terminate at the meter” | 61G4-12.011(7) |
| Water line on a larger building | Yes, ending “no closer than 5 feet from a building or at the secondary meter”, whichever is further | 61G4-12.011(7) |
| Sewer on one to four family structures | Yes, from the lot line outward | 61G4-12.011(4) |
| Empty conduit in rights of way, easements and parking lot sleeves | Yes, if engineer designed and with no “conductor wiring or connection to an energized electrical system” | 489.105(3)(n) |
| Pulling wire or energizing that conduit | No | 489.105(3)(n) |
| Fire line piping used only for the fire system | No, it “may not install” it | 489.105(3)(n); 633.102 |
| Headwalls, retaining walls, lift station housings | Yes, up to 20 feet above grade and 500 square feet | 61G4-12.011(14) |
| Clearing, grubbing, grading and site work on any project | Yes, if certified | 489.113(3)(a) |

The fire line rule is the one that costs money. The statute says the contractor “may not install piping that is an integral part of a fire protection system as defined in s. 633.102 beginning at the point where the piping is used exclusively for such system.” Up to that point the water main is yours. After it, the pipe belongs to a fire protection contractor licensed under chapter 633, a separate state program outside Chapter 489.
Gas and line locating do not appear in the definition at all. Silence is neither permission nor prohibition; it means asking DBPR or the permitting office.
Can a general contractor or a plumber do underground utility work?
Here the statute is more generous than the forums. Section 489.113(3)(d) says a general contractor “shall not be required to subcontract the construction of a main sanitary sewer collection system, storm collection system, or water distribution system, not including the continuation of utility lines from the mains to the buildings, and may perform any of the services, on public or private property, for which a license as an underground utility and excavation contractor is required”.
Read the two halves separately. The first frees the general contractor from subcontracting the mains, and carves the service lines out of that freedom. The second then says the general contractor may perform “any of the services” the underground license covers. The halves sit awkwardly on service lines, and this page will not pretend otherwise. Paragraph (e) settles one case: in mobile home parks the continuations “are to be considered a part of the main sewer collection and main water distribution systems.” For anything else at the building end, ask the permitting office before the bid, not after the trench.
Building and residential contractors get much less. Paragraph (a) lets them do “clearing and grubbing, grading, excavation, and other site work”, but “limited to the lot on which any specific building is located.” The plumber, meanwhile, overlaps from the other side: 489.105(3)(m) gives a plumbing contractor “public or private water supply systems”, “storm and sanitary sewer lines” and “any excavation work incidental thereto”. The plumbing license page covers that trade in full.
| License | Mains | Lines from main to building | Site work | Source |
|---|---|---|---|---|
| Underground utility, certified | Yes | Yes, to the meter or termination point | Any project | 489.105(3)(n); 489.113(3)(a) |
| General contractor | Yes, no subcontract needed | Excluded from the no subcontract clause; see the second half of (3)(d) | Any project, if certified | 489.113(3)(a), (d) |
| Building or residential contractor | No | No | Own lot only | 489.113(3)(a) |
| Plumbing contractor | Water supply and sewer lines, with incidental excavation | Yes | Incidental only | 489.105(3)(m) |
What experience and insurance does the board require?
The eligibility test is section 489.111(2)(c). The common route is “a total of at least 4 years of active experience” as a skilled worker or foreman, “provided, however, that at least 1 year of active experience shall be as a foreman.” The degree route needs a bachelor’s “in the appropriate field of engineering, architecture, or building construction” plus one year of proven experience, and the statute counts “a minimum of 2,000 person-hours” as a full time year.
Rule 61G4-15.001(4)(e), effective 16 May 2024, names the fields for this trade: “Underground Utility Classification: Building Construction; Civil or Mechanical Engineering.” Experience must be “gained under the supervision of a contractor” properly licensed in the category, and work done under a section 489.103 exemption “will not be accepted.” The full requirement set is in Florida contractor license requirements, rule by rule.
Rule 61G4-15.003 sets the insurance. Its table lists “Underground Utility and Excavation Contractor” at $100,000 of public liability and $25,000 of property damage, against the general contractor’s $300,000 and $50,000. The certificate holder must be the Construction Industry Licensing Board. Section 489.114 adds workers’ compensation evidence “pursuant to chapter 440” before issue or renewal, and section 489.115(9) requires “a complete set of fingerprints” with the first application.
Underground utility application checklist, from the statute and the rules
Tick each item as you assemble it. Every line comes from the statute or a board rule quoted on this page; it is not a ruling on eligibility and does not replace the current DBPR form.
Ticks are saved only in this browser. Download the current application from DBPR before filing; this list cannot tell you whether you qualify.
Which exams does the underground utility route involve, and what do they cost?
Two exams: Business and Finance and the underground utility trade exam. The trade exam’s Examination Content Information sheet, effective 9 September 2014 and read through an archived copy, says it is given “daily in Computer Based Testing (CBT) format” with “80 equally weighted questions”. DBPR’s Examinations at a Glance sheet gives five hours for it, and 6.5 hours for Business and Finance. Both are open book. Permanent tabs and highlighting are allowed; written notes are not.

| Content area | Share of questions |
|---|---|
| Pre-installation | 20 percent |
| Excavating, backfill and compaction | 20 percent |
| Pipe installation and repairs | 15 percent |
| Piping, valves and fittings | 15 percent |
| Testing, disinfecting and job close out | 10 percent |
| Equipment | 10 percent |
| Traffic control | 5 percent |
| Drainage systems | 5 percent |
The sheet says each share “may vary by as much as plus or minus three (3) percent”. It also lists the math: areas, volumes, “calculating the sides of triangles” and simple algebra. Grade and trench volume are where open book stops helping.
The fees come from rule 61G4-12.009: “three hundred thirty-five dollars ($335.00)”, nonrefundable, paid as $135 when you schedule, $80 for each test, and $40 after you pass. Two tests make $135 + $80 + $80 + $40 = $335. A retake is “one hundred thirty-five dollars ($135.00)” plus $80 per test, and the rule names no waiting period. Then “The initial certification or registration fee” is $200, and renewal is $200 every two years. The scheduling vendor is Professional Testing, Inc., and the Business and Finance exam page covers the shared exam.

What do people dealing with underground utility licensing report?
Three accounts, read on 25 October 2026 and paraphrased. A small sample, and what people report, not findings about the board.
In r/GeneralContractor, December 2024, a Florida general contractor asked whether they could pull a permit for a friend’s job that tapped a city line; the county could not tell them. The top reply said a general contractor cannot pull underground utility permits and that some towns allow it only because they do not know the law. Another reply pointed out it was a commercial job with right of way work. Nobody quoted paragraph (3)(d).
The same commenter linked a contractortalk.com thread, December 2023, in which a property owner described an underground contractor, recommended by a supplier, who hit a gas main without calling 811. The area was evacuated for about six hours. Only then did the owner search DBPR and the county and find no record of the company, and withheld payment citing section 489.128. A reply suggested checking the exact company name on Sunbiz first.
In r/UtilityLocator, November 2025, a Texas locating company expanding into Florida asked whether marking lines for a gas utility needs this license. They said DBPR told them to read the statute, which they did, and it “didn’t say either way”. One reply said locators who only mark do not need it; that is a forum view, not a ruling.
Where the accounts match the rule text: section 556.105(1)(a) requires an excavator to notify the system “Not less than 2 full business days before beginning any excavation”, and section 489.128(1) makes contracts by an unlicensed contractor “unenforceable in law or in equity by the unlicensed contractor.” Where they do not: the claim that a general contractor can never do this work runs into paragraph (3)(d). The unlicensed contracting page covers the penalties.
Where do the ranking pages disagree with the rule text?
Two ranking pages were read on 25 October 2026. Both sides are quoted.
| Claim | Who says it | What the rule text says |
|---|---|---|
| General contractors “cannot perform the actual utility connections or excavation unless they hold this specific CUC license” | Centrel Services, 7 February 2026 | 489.113(3)(a): a certified general contractor “may perform clearing and grubbing, grading, excavation”; (3)(d): “may perform any of the services” of the license |
| Scope limited to mains, fire piping excluded, the GC exception read clause by clause | floridageneralcontractorlicense.com, checked 22 September 2026 | Matches 489.105(3)(n) and 61G4-12.011; no fees given |
In fairness, Centrel is an underground firm writing about its own trade, and it is right that tapping a main needs a licensed contractor. It goes wrong on the general contractor, the error that costs a bid. The general contractor license page covers that side of the line.
Frequently asked questions
Does the Florida underground utility license cover gas lines?
Section 489.105(3)(n) names sewer, water and storm systems and says nothing about gas. The plumbing contractor definition in 489.105(3)(m) does name natural gas installation. Ask DBPR or the permitting office before bidding gas work under this license.
Can an underground utility contractor install a fire line?
Only up to a point. The statute says the contractor may not install piping that is an integral part of a fire protection system, beginning where the piping is used exclusively for that system.
Is the underground utility exam open book?
Yes. The trade exam is 80 equally weighted computer based questions with permitted references, and the Business and Finance exam is also open book. Permanent tabs and highlighting are allowed, written notes are not.
What does it cost to sit both underground utility exams?
Rule 61G4-12.009 sets $335: $135 at scheduling, $80 for each of the two tests, and $40 after passing. The initial license fee of $200 comes on top.
Which degrees count toward the underground utility license?
Rule 61G4-15.001(4)(e) names building construction, civil engineering and mechanical engineering. The degree route still needs one year of proven experience in the category.
How much insurance does an underground utility contractor need?
Rule 61G4-15.003 sets $100,000 of public liability and $25,000 of property damage, with the Construction Industry Licensing Board as certificate holder, plus workers’ compensation evidence under section 489.114.
Finished the page? The same five questions from the top, to see what stuck.
Rules and fees change without notice. This page was checked against the sources linked above on the date shown. If you find something different, tell us in the comments.