Certified general contractors Melbourne FL homeowners hire hold a statewide license from the DBPR, and section 489.105 lets them work anywhere in Florida without passing local exams. Check the number on the state license search, then confirm whether the City of Melbourne or Brevard County issues the permit for that address.
Listen to this article, about 12 minutes. A synthetic voice reads the article and announces each section title as it begins; tables are read row by row and the questions at the end are left out.
Recorded 15 November 2026 from the article as published that day. Press a chapter to jump there; the highlighted line is what is playing. A play button sits beside every section heading, and once you scroll past this player a bar at the bottom of the screen keeps the controls in reach. Tap or click any sentence to hear the reading start from there.
On this page: the statute’s own definition of a certified contractor, what the City of Melbourne and Brevard County each ask for, four places their pages and Chapter 489 disagree, and what one Melbourne permit counter thread reports.
Think you already know this? Five questions, one minute.
Every answer is on this page. Answer from what you know now; the page fills in the rest.
-
1. Under section 489.105(8), where may a certified contractor contract?
The definition says a certified contractor “shall be allowed to contract in any jurisdiction in the state” without meeting local competency requirements. Section 489.105 Read the section
-
2. What does Melbourne’s Building Section FAQ ask a state registered contractor to show that a certified one does not?
The FAQ lists a copy of the state registration and a “Brevard County Competency Card” for registered contractors. Melbourne Building Section FAQ Read the section
-
3. Which job scope does section 489.117(4)(a)1. list among those a local government may not license?
Painting, flooring, cabinetry, handyman services, plastering, pressure washing and stuccoing are on the list. Section 489.117 Read the section
-
4. What does section 489.127(1) say about a business tax receipt?
The section says a receipt issued under chapter 205 “is not a license for purposes of this part.” Section 489.127 Read the section
-
5. Which work does the HB 803 permit exemption leave out?
The exemption does not apply to electrical, plumbing, structural, mechanical or gas work, or to flood hazard areas. Florida Building Commission HB 803 summary Read the section
This is a how to check page, not a directory. It names no contractor and rates nobody. It reads the statute, the City of Melbourne’s building pages and Brevard County’s licensing pages side by side, all on 15 November 2026, and points out where they do not quite agree. This site has no connection to the DBPR, the Construction Industry Licensing Board, the city or the county.
What does certified mean for a Melbourne general contractor?
It means the license came from the state, not the county, and it travels. Section 489.105(8) defines a certified contractor as one holding a certificate of competency from the department “who shall be allowed to contract in any jurisdiction in the state without being required to fulfill the competency requirements of that jurisdiction.” The same section, at (3)(a), makes a general contractor one “whose services are unlimited as to the type of work which he or she may do,” subject to the carve outs in 489.113.
A registered contractor is the other kind. Under 489.105(10) it is one who registered “pursuant to fulfilling the competency requirements in the jurisdiction for which the registration is issued.” Section 489.117(1)(b) keeps that contractor inside those lines: registration allows contracting “only in the counties, municipalities, or development districts where he or she has complied with all local licensing requirements.”
| Question | State certified general (CGC) | State registered general |
|---|---|---|
| Who tested them | The state | A local jurisdiction |
| Where they may work | Anywhere in Florida, 489.105(8) | Only where they met local rules, 489.117(1)(b) |
| What Melbourne asks for at permit | State certification plus workers’ comp proof or exemption | State registration, a Brevard County competency card, workers’ comp proof or exemption |
| Local license allowed? | No, per 489.131(3) | Yes, that is the basis of it |
On the DBPR search a certified general contractor’s number begins CGC, and what each license lookup result means walks through every prefix. How the license itself is earned is in what the rules require for a Florida general contractor license.
Who handles contractor paperwork inside Melbourne city limits?
Melbourne is an incorporated city, so its own Building Section issues permits for addresses inside city limits. Brevard County’s Contractor Licensing Board page says the county board’s jurisdiction covers people working “in the unincorporated areas of the county.” Viera, for example, is unincorporated, so a Viera job goes to the county in Viera, not to Melbourne.
The city’s Building Section FAQ lists what each kind of contractor shows at permit time. State certified contractors bring a “Copy of State Certification and proof of Workers’ Compensation Insurance or Affidavit of Exemption.” State registered contractors add a “Brevard County Competency Card.” Specialty contractors are “Licensed by the County.” That last line comes back in the disagreement table below.
The city also taxes the business. Its license requirements page says a general building contractor “is required to submit a copy of their current, active State license prior to obtaining a Business Tax Receipt,” with “Proof of liability insurance required.” That is a receipt for a tax, not a license, and the statute says so in as many words, as the check section explains.

What does Brevard County still license after 2024?
More than the statute seems to allow, at least on paper. Brevard’s licensing office says it “registers State Certified Contractors, and issues County licenses” called Certificates of Competency. A certified contractor who wants to permit online links the state license to a BASS account, and the registration page asks for the actual certificate, “not a summary from the state website,” plus a business tax receipt, general liability and workers’ comp proof. It adds that the business name “must match as it appears on your qualifying license.”
The state took most local licensing away in 2024. Section 489.117(4)(a)1. says a local government “may not require a person to obtain a license, issued by the local government or the state, for a job scope which does not substantially correspond” to a state category, and lists painting, flooring, cabinetry, handyman services, plastering, pressure washing and stuccoing among them. The House staff analysis of a 2024 bill, read on 1 November 2026, dates the prohibition to 1 July 2024. Subparagraph 3. keeps older local licenses for veneer and “fence installation and erection” only if imposed before 1 January 2021.
Brevard’s handyman page still lists 29 trades needing a county certificate. Most match a state category on the county’s own state list, such as garage door, window and door, and drywall. Fencing can survive under subparagraph 3., and sheet metal is a state category in 489.105(3). That leaves two with no state match on the page: Storm Shutter Contractor and Excavating / Land Clearing Contractor. Whether those scopes substantially correspond to a state category is exactly the question the statute turns on, and the county page does not answer it. Ask the county before you pay for a certificate, or before you refuse a bidder who lacks one.

How do you check a Melbourne contractor before you sign?
Five checks, in this order, cover most of the risk:
- Search the name and number on the DBPR license search. A certified general number begins CGC. The status must read current and active.
- Read section 489.127(1) before you accept an excuse: “a person or business organization operating on an inactive or suspended certificate or registration is not duly certified or registered and is considered unlicensed.”
- Match the business name on your contract to the business the license qualifies. Brevard asks for the same match before it registers anyone.
- Ask for a certificate of general liability and either workers’ comp coverage or an exemption. Melbourne asks for the same pair at permit time.
- Ask who pulls the permit, and see the contractor’s own name on it.

One trap needs saying plainly. A business tax receipt on the wall proves a tax was paid. Section 489.127(1) says “a business tax receipt issued under the authority of chapter 205 is not a license for purposes of this part.” The penalties for hiring or being an unlicensed contractor are set out in Florida’s unlicensed contracting penalties, by statute.
Before you sign with a Melbourne contractor
Tick each check as you do it. It records your own steps; it does not vouch for, rate or approve any contractor.
Rules read on 15 November 2026 from Chapter 489, the City of Melbourne and Brevard County. Confirm anything you rely on with the office that issues your permit.
Does the $7,500 permit exemption change who you can hire?
No. It changes the permit, not the license. HB 803 took effect on 1 July 2026, according to the Florida Building Commission’s summary of the bill. It says a local government “shall exempt an owner of a single-family dwelling or the owner’s contractor from the requirement to obtain a building permit to perform any work valued at less than $7,500.”
The exemption does not cover “work on a property that is partially or entirely located in a flood hazard area,” or “any electrical, plumbing, structural, mechanical, or gas work.” A project also may not be split into several smaller ones to slip under the line. Coastal Melbourne has flood zones, so check the map before assuming a job qualifies. Nothing in the exemption makes unlicensed contracting legal: work that needed a licensed contractor still needs one. The $2,500 handyman line is a separate rule, covered in what Florida’s $2,500 handyman rule covers.
What do Melbourne homeowners report about permits?
We looked for public accounts from Brevard, through r/brevardfl, r/321 and wider Reddit searches and the DBPR’s public notices, which refused automated reads. One thread carried real detail: a March 2026 post on r/321, with 39 comments, about a homeowner turned away at the Melbourne permit counter. It is one thread, so read it as what people report, not as a measured pattern.
The poster says they went to permit a garage mini split as an owner builder, were asked whether they were licensed, and were told their AC contractor would have to pull the permit instead. They had first been told by the county that the address was in Melbourne’s jurisdiction. A commenter who said they were a licensed electrical contractor guessed the application lacked energy and load calculations, and said the city has no problem with owner builders who bring complete paperwork. Another, who said they pull permits every week, listed a subcontractor agreement and product approvals among the papers needed. A third, holding a county journeyman card, said departments tightened owner permits because unlicensed contractors were having homeowners pull them.
Several commenters simply advised skipping the permit, and one in the trade said many contractors install without one. That advice cuts against the rules, not with them. The city’s own owner builder guide explains why departments are wary: anyone who bids and brings a crew is acting as a contractor “regardless of any written or verbal disclaimer such as ‘I am not a licensed contractor but I will perform the proposed work items at an hour rate.’” A mini split is mechanical work, so even after July 2026 the $7,500 exemption would not cover it.
Where do the city and county pages disagree with the statute?
Most pages that rank for this search are directories and lead forms. The useful gaps are between the official pages and the law, as read on 15 November 2026:
| What the city or county page says | What the statute says | Sources |
|---|---|---|
| County certificate required for Storm Shutter and Excavating / Land Clearing work | No license for a scope that does not “substantially correspond” to a state category | Brevard handyman page; 489.117(4)(a)1. |
| Remodeling, renovations and repairs must “be done by a licensed contractor” | Interior remodeling with no state licensed task is on the may not license list | Brevard handyman page; 489.117(4)(a)1. |
| Specialty contractors are “Licensed by the County” | No county may require a certificateholder “to obtain a local professional license” | Melbourne FAQ; 489.131(3) |
| The county “registers State Certified Contractors” | A certificateholder must “only” show a current certificate and pay the usual fees | Brevard licensing; 489.113(4)(a) |
The last row is less of a clash than it looks. Brevard’s licensed trades page says state licenses “may be registered” for online permitting, so registration is the price of using BASS, not a second license. Volusia handled the same 2024 cutoff very differently; see what Volusia County checks.
Frequently asked questions
Is a CGC license from Brevard County or the state?
From the state. The DBPR issues it under Chapter 489, and section 489.105(8) lets it be used in any Florida jurisdiction.
Where is Brevard County’s contractor licensing office?
Its page gives 2725 Judge Fran Jamieson Way, A114, Viera, FL 32940, and the phone number (321) 633-2187.
Can a Melbourne homeowner pull a permit without a contractor?
Yes, as an owner builder. The city’s FAQ sets conditions, including that the property is “not for sale or lease for a period of one year.”
Does Brevard County issue a handyman license?
No. Its handyman page says “there is no such thing as a Handyman License in Brevard County.”
What is the commercial limit for an owner builder permit in Melbourne?
The city’s guide says it issues commercial owner builder permits for work costing under $75,000.00, for a building the owner uses and does not sell or lease.
What does a state registered contractor show at a Melbourne permit counter?
The city’s FAQ asks for a copy of the state registration, a Brevard County competency card, and workers’ comp proof or an exemption affidavit.
Finished the page? The same five questions from the top, to see what stuck.
Rules and fees change without notice. This page was checked against the sources linked above on the date shown. If you find something different, tell us in the comments.

Leave a Reply